1. Shaker screen selection GNPS703 shale shaker can fix different meshes screen. This equipment can use 10-200mesh screen. Usually, when the shale shaker is first stage solids control equipment the shaker screen can be 30-100mesh. When the shale shaker is a part of mud cleaner, the screen can be 80-200mesh, click here to know more. Shaker screen selection can among manufacturer engineer, user, and contractor discussion. Replacement screen should be selected specially from manufacturer 2 Replace shaker screen process To make screen installation and uninstall more easy, GNPS703 designed fast installation structure. The structure is a special type use tension wedge to fix screen. Refer to fig IV. The structure including shelve strip, desander desilter. The first screen installation, we should inspect the screen dimension, such as 1250±2mm, the tolerance can’t over it. After fixed rubber strip, then put screen, shelve strip from shaker back (drilling fluid input), and push wedge evenly on two sides use hammer to push or tension wedges, make two sides identical. Tension each screens subsequently.Shaker screen replacement, during operation, when screens broken or need to be replaced , please refer to fig IV. Get wedge out, then bring out screen, check if rubber strips are sufficient; then put new screen on shaker deck and tension it steadily. The replacement is finished 3 Tension wedge sketch Note: During shaker operation, the tension wedge may appear loose, operator should inspect shaker screen frequently and push or tense the wedge by hammer 4 Shaker deck angle adjustment Shaker deck angle adjustment refer to fig V. There are lifter, pipe, lifter pipe, scale indicator, scale, connection plate, etc. When we make adjustment, handle wheel rotary by clockwise, shaker deck angle will be larger; handle wheel rotary by anti clockwise shaker deck angle will be less. Shale shaker output angle adjustment can be operated under running and off. When finish the shaker deliver it, the shaker deck is 0°. When user operate shaker, according to drilling mud property and flow rate on job site, and adopts same screen, the angle is higher, the treating performance will be better while treating capacity will be higher. When drilling fluid is leaking on shaker deck, increase deck angle can get rid of fluid flow away. Angle range: -2 ~ +8°, rated angle is 0~ +5° Resource Box : The author of the article recommends desander for everyone.