Water well drilling normally is drilling 200-2000m depth and don’t need very high confirguration for mud recycling system. Depending on drilling conditions, clients choose different equipments to makes different confirguration to meet drilling application
Shale Shaker For First Phase Cleaning
- Shale shaker cleaning 200-400micron drilling cuttings
- Shaker deck is the most important mechanical parts for a shale shaker.
- Shaker screen size and G force is the main technical points for shaker
- Vibrator motor gives G force to shaker
- Deck angle adjust to make good angle to adjust cuttings dryness
Shaker Screen
- Wedge type shaker screen for fast replace
- Flat or Pyramid shaker screen dependong on drilling conditions
- Shaker screen area and effecitive area is important to shaker performance