1000HP drilling rig will require solids control equipment for drilling mud recycling and storage. GN just finished one set to Poland end of last month.
Before design a set of solids control system, you need confirm bellowing questions:
- Mud flow requirement. This need confirm to choose shale shaker and desander desilter
- If vacuum degasser required
- How many set of decanter centrifuge require
- High speed decanter centrifuge or middle speed or both?
- Mud tank holding capacity needed
- Mud tank dimention limit and requirement
- Mud tank compartment required
- Jobsite layout and jard limit to design mud tank layout
- Mud suction line size and outlet position to suilt mud pump
- If need tank roof or not
- Other special request
GN Solids is one of the leading solids control eqipment suppllier, please contact us freely for inquiry or techinical.