Diamond drilling requires mud cleaning system with very compact design and low mud flow rate. GN build this mini mud system for diamond drilling with spec:
1) Treating capacity: 150 liters per minute
2) GNZS752 shale shaker for first phase to separate 100 micron and above
3) GN223 centrifuge for second phase to separate 2-5 microns
Please contact GN for Diamond drilling mud cleaning system freely
1) Treating capacity: 150 liters per minute
2) GNZS752 shale shaker for first phase to separate 100 micron and above
3) GN223 centrifuge for second phase to separate 2-5 microns
Please contact GN for Diamond drilling mud cleaning system freely
