GN build drilling waste management equipment (DWM) but many people is asking what they do. Compared with solids control system, DWM equipment is maily treat solids out of shale shaker for drying and recycling fluid. A vertical cutting dryer will be the first phase to dry solids and decanter centrifuge for second phase to recyling fluis.
Author: gnadmin
500GPM mud unit from CIPPE exhibiton
Hi, we are very happy to inform that GN back from CIPPE exhibition with 500GPM mud unit shown successfuly. This is a 2 phase cleaning mud unit but trailer mounted for fast moving.
One Shale shaker and one desilter is installed on 40ft mud tank for recycling with mixer. Please contact us freely for inquiry.
No Dig mud cleaning unit in Australia
No Dig call horizontal direction drilling too, when no dig drills, it will need mud cleaning unit to recycling mud. GN Solids Control is manufacturer and has stock in Australia for mud cleaning unit and spare parts
Shale shaker, desilter, mud tank, centrifugual pumps are the main equipment for a complete unit. Pls contact us if you need any of them
Our Drilling Waste Management Equipment Shown in CIPPE
Today is happy to inform that we are going to show GN drilling waste management equipment in CIPPE exhibition which is the leading oil & gas show in the world
Hi-G shaker, vertical cutting dryer, decanter centrifuge is the main equipment for a drilling waste management system
Please contact us for inquiry freely
CIPPE exhibition for drilling equipment
CIPPE Exhibition will be held in China on 19-21 March for drilling equipments, bellowing will be main equipments for show:
1) Drilling Rig
2) Mud Pump
3) BOP
5) Other Drilling Equipments
Please contact us if you are intrest in GN Stand on CIPPE exhibition