Desanding plant is designed for piling rig which is belong to city foundation drilling. According to Australia piling industry, GN designed piling desanding plant for Australia accordling.
Piling Desanding Plant Technical Request
1. Need very compact design to minimum footpring
2. Don’t need separate very fine solids particals
3. Contains big stones or solids particals then oil drilling mud
4) Request fast moving and easy transport
5) No need for mud mixing
What Equipments Piling Desanding Planit Need?
1. Shale shaker with seive type shaker screen to separate big stones and larger solids particals.
2. 10-15" desander cones to separate sand and silimar solids particals
3. Compant mud tank to mud storage
4. Pump to transfer piling mud
GN has Australia branch also. Please visit GN Australia Web