750hp is often a typical rig model for Geothermal drilling. Geothermal drilling rig is normally made use of in higher temperature volcanic rock area. Mud Cleaning System is greater. It requests high high-quality solids manage equipment for mud recycling program.
Recommend proposal for 750hp Geothermal Mud Cleaning System.
1) 1 pieces of mud tank, 3 oilfield runner, mounted on heavy duty skid. Usable volume equal 50cbm. Dimension per customer request, recommended as under:
– Length 12500mm (41 ft)
– Height 2000mm (six.5 ft)
-Width 2400mm (eight ft)
The mud tank is devided to 5 compartments with troughs and spills :shaker pit, recycling pit, mixing pit, storage, trip pit.
2) Linear motion Tri-screen (three panel) Shale Shaker, 2 sets, model GNZS703E advisable
3) Mud Hopper, 2 sets, installed at one particular end of your tank
4. Mud Agitators, 2 sets. One particular in every compartment
five. Centrifugal Pumps. Quantity as expected
6. Ex-proof lights, Valves (Bridge gate valves), ladders, handrails & accessory equipment
Mud storage tank consumer prepare it locally to save time and reduce total cost on international shipment.
CBM DRILLING MUD RECYCLING SYSTEM AND DIAMOND CORE DRILLING MUD SYSTEM:http://mudcleaner.wordpress.com/2014/07/10/cbm-drilling-mud-recycling-system-and-diamond-core-drilling-mud-system/