150GPM Mud Recycling And Mixing Tank System Sold To Australia

Normal
0

7.8 磅
0
2

false
false
false

EN-US
ZH-CN
X-NONE

/* Style Definitions */
table.MsoNormalTable
{mso-style-name:普通表格;
mso-tstyle-rowband-size:0;
mso-tstyle-colband-size:0;
mso-style-noshow:yes;
mso-style-priority:99;
mso-style-parent:””;
mso-padding-alt:0cm 5.4pt 0cm 5.4pt;
mso-para-margin:0cm;
mso-para-margin-bottom:.0001pt;
mso-pagination:widow-orphan;
font-size:10.5pt;
mso-bidi-font-size:11.0pt;
font-family:”Calibri”,”sans-serif”;
mso-ascii-font-family:Calibri;
mso-ascii-theme-font:minor-latin;
mso-hansi-font-family:Calibri;
mso-hansi-theme-font:minor-latin;
mso-bidi-font-family:”Times New Roman”;
mso-bidi-theme-font:minor-bidi;
mso-font-kerning:1.0pt;}

GN sold one set 150GPM mud recycling and mixing tank system at Gold Coast show in Aug for horizontal directional drilling ( HDD ) rig which will be drilling at west Australia.

Main Equipments And Technical For GN 150GPM Mud Recycling And Mixing Tank System

Normal
0

7.8 磅
0
2

false
false
false

EN-US
ZH-CN
X-NONE

/* Style Definitions */
table.MsoNormalTable
{mso-style-name:普通表格;
mso-tstyle-rowband-size:0;
mso-tstyle-colband-size:0;
mso-style-noshow:yes;
mso-style-priority:99;
mso-style-parent:””;
mso-padding-alt:0cm 5.4pt 0cm 5.4pt;
mso-para-margin:0cm;
mso-para-margin-bottom:.0001pt;
mso-pagination:widow-orphan;
font-size:10.5pt;
mso-bidi-font-size:11.0pt;
font-family:”Calibri”,”sans-serif”;
mso-ascii-font-family:Calibri;
mso-ascii-theme-font:minor-latin;
mso-hansi-font-family:Calibri;
mso-hansi-theme-font:minor-latin;
mso-bidi-font-family:”Times New Roman”;
mso-bidi-theme-font:minor-bidi;
mso-font-kerning:1.0pt;}

The chose double deck shale shaker for first and second phase cleaning by install 3×4”desilter cones on shale shaker. The bottom deck will run 40-80mesh shaker screen for first phase cleaning and top deck running 120-200mesh screen for drying solids out of desilter cones

A small mixer including mixing pump and mixing hopper includinged, mixing hopper sited on tank top while mixing tank on tank sikid, we make a 1.5m door on handrail beside mixing hopper for pallet travel while mixing

4m long mud tank divided 2 compartments, the first one is a sand trap bellow shale shaker and the second one is a mixing compartment bellow mixing hopper. Tank ground have 5 degree angle to enable mud discharge and clean better

Mud gun installed on mixing compartment for agitator purpose as no agitators installed because of limit space. Mud gun line goes on side pipe which is powered by mixing pump

There is a T outlet at mixing pump outlet to enable mixing pump working as a transfer pump if needed. This is not requested by clients but GN supply this idear to give clients more choice and convenience while working with GN mud recycling and mixing tank system on jobsite

OTC 2014 – GN Solids Manage & GN Solids America

OTC 2014 falls on 5-8, May, 2014, it is one of the most important oil gas event held in Huston, TX, USA. As in previous years, GN will bring heavy machine and demonstrate the actual Solids Control Equipment to the world buyers.

GN Solids Control (China) together with GN Solids America (USA) will attend the exhibition but in separate booth:

Reliant Arena 9241 (320SF) – GN Solids Handle (China)

Reliant Arena 10147 (190SF) – GN Solids America (USA)

Solids Handle Equipment at 2014 OTC

1) VFD & PLC manage Decanter Centrifuge – GNLW363VFD

2) Big bowl Big Volume Decanter Centrifuge – GNLW553VFD

3) High G Dryer Desander

4) Vertical Cuttings Dryer

5) Shale Shaker Screen

6) USA Vacuum Degasser

 

GN Solids America wholly held by GN Solids Manage is in operation with sales office, warehouse inventory and after sales service. If you would like to have a visit to the Houston Office during the show, please email us to request the meeting, and now Vacuum Degasser is 30% discount OFF for sale, if you have any question please contact us.

GN will attend Drill 2014 at Gold Coaste Australia and Show there 150GPM Mud Cleaning System

In past numerous years, GN Solids Control was very active in Australia drilling industry. You can discover GN’s trace in the industrial exhibition and magazines. GN also did a lot on going to client for face to face talking and telephone calls for giving the Mud Cleaning System option.
This year, GN would show at Drill 2014 in Gold Coaste Australia and bring there GN 150GPM Mud Cleaning System. Drill 2014 is hold by Australian Drilling Industry Association (ADIA) who is working to provide expert and technical leadership in goal of advancement of drilling industry. ADIA organize exhibition just about every 2 years to create a platform where the suppliers and drillers could have a opportunity to obtain together. That no doubt is useful to both the suppliers and drilling contractors.
GN 150GPM Mud Cleaning System Specification
3 units 4 inch desilter cone installed on a GNZS703D double deck shale shaker, the nether significant screen is made use of as primary vibrating screen to get rid of the coarse solids. The discharge out from the de-silter cone would be additional dryer by the upper screen.
2 units 4×3 centrifugal pump of 15 HP fixed around the mud tank. One of your pumps is applied feeding drilling mud to desilter cone. The other unit is employed as mixing pump matching the jet mud mixer.
4 meters long mud tank with very compact design and style and layout could be a lot suitable for the drilling area without sufficient space.
GN Solids Control could also be found at under activities:
Advertisement issued by ADIA and also the exhibition organized by ASTT each year
Advertisement issued by ASTT and exhibition organized by ADIA every single 2 year
Suan Basin Mining & Energy Expo from 2014
Australia market is a very impartant part for GN’s global strategy, for more information on the exhibition and request for solid manage equipment, please feel free to contact with us.

How to Layout the Mud Recycling System on The Field

GN Solids Will Show 150GPM Mud System At Drill 2014 In Australia

GN Solids Control is one of the leading solids control equipment manufacturer in China and supply a complete mud system for Australia. GN will take part in Drill 2014 to show a 150GPM mud system

Advantages Of GN 150GPM Mud System Designed For Australian Drillers

  1. 4 m long mud tank with 2m wide and 1.3m high for fast moving with container locks and fock lift points
  2. GNZS703 double deck shale shaker with top   deck drying solids from desilter and bottom deck for first phase cleaning
  3. 3×4" desilter cone to separate solids above 20 microns
  4. 11kw SB4x3   centrifugal pump to feeding desilter cones and another same pump for mixing chemicals and feeding mixing hopper
  5. 2" mud gun installed at mixing compartment 

Drill 2014 At Gold Coast In Australia

  1. Drill 2014 is organized by ADIA and held in Gold Coast this year
  2. Many clients in Coal Seam Methan and Diamond Drilling industdry will come and visit stand to source machines
  3. There will be many drilling rig suppliers, mud pump suppliers, solids control equipments suppliers and other related tools and machine supplier come to show there equipments
  4. Exhibition started at Aug 19 till Aug 21 with 3 days showing

GN took part in Drill 2012 in Adlaide 2 years ago and will have more activities in Australia to improve GN equipments, pls feel free to contact us

750hp Geothermal drilling rig Mud Cleaning System

750hp is often a typical rig model for Geothermal drilling. Geothermal drilling rig is normally made use of in higher temperature volcanic rock area. Mud Cleaning System is greater. It requests high high-quality solids manage equipment for mud recycling program.
Recommend proposal for 750hp Geothermal Mud Cleaning System.
1) 1 pieces of mud tank, 3 oilfield runner, mounted on heavy duty skid. Usable volume equal 50cbm. Dimension per customer request, recommended as under:
– Length 12500mm (41 ft)
– Height 2000mm (six.5 ft)
-Width 2400mm (eight ft)
The mud tank is devided to 5 compartments with troughs and spills :shaker pit, recycling pit, mixing pit, storage, trip pit.
2) Linear motion Tri-screen (three panel) Shale Shaker, 2 sets, model GNZS703E advisable
3) Mud Hopper, 2 sets, installed at one particular end of your tank
4. Mud Agitators, 2 sets. One particular in every compartment
five. Centrifugal Pumps. Quantity as expected
6. Ex-proof lights, Valves (Bridge gate valves), ladders, handrails & accessory equipment
Mud storage tank consumer prepare it locally to save time and reduce total cost on international shipment.
CBM DRILLING MUD RECYCLING SYSTEM AND DIAMOND CORE DRILLING MUD SYSTEM:http://mudcleaner.wordpress.com/2014/07/10/cbm-drilling-mud-recycling-system-and-diamond-core-drilling-mud-system/