No Dig Drilling is a very important part for city building, Australia has a lot of No Dig drilling to do city jobs. Main drilling equipments:
1) No Dig drilling rig
2) Mud system
3) Mud pump
4) Generator
5) Other parts
No Dig Drilling is a very important part for city building, Australia has a lot of No Dig drilling to do city jobs. Main drilling equipments:
1) No Dig drilling rig
2) Mud system
3) Mud pump
4) Generator
5) Other parts
Decanter centrifuge for drilling waste management is high speed and separate solids 2-5 microns fine. Main parts of DWM centrifuge:
1) Motor and control panel
2) Screw and Bowl
3) Skid and support frame
Please visit more on drilling waste management equipments
GN deliveried 3 sets 500GPM mud recycling tank for a China buyyer which is the bigest in China for pipeline industry. It’s main equipments:
1) 1 set GNZS594 linear motion shale shaker.
2) 1 set GNZJ594 desander and desilter combination
3) 2 sets feeding pumps
4) 1 set mud recycling tank.