Dear all, GN will bring a 200GPM mud recycling system to Australia to show for trenchless 2012 on No Dig equipment. It’s contains 2 phase cleaning with shaker and desilter with mixing pump and mixing hopper with a very compact design.
Other than No Dig exhibition in Oct, GN Australia will take part in Drill 2012 exhibition in Sep and estimate to bring a 200GPM or 500GPM mud system there.
Australia have a lot of drilling related to No Dig drilling and Coal Bed Methan drilling, Hope this info will helps all users in Australia to see a top quality mud syste犀利士
m design